梅薩巴能源項(xiàng)目最終環(huán)境影響報(bào)告書第1卷MESABA ENERGY PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT VOLUME 1
- 資料類別:
- 資料大?。?/li>
- 資料編號(hào):
- 資料狀態(tài):
- 更新時(shí)間:2021-09-09
- 下載次數(shù):次
資料簡(jiǎn)介
這份最終的環(huán)境影響報(bào)告(EIS)提供了有關(guān)擬議的Mesaba能源項(xiàng)目的潛在環(huán)境影響的信息,該能源項(xiàng)目是一個(gè)煤基綜合氣化聯(lián)合循環(huán)(IGCC)發(fā)電設(shè)施,將位于明尼蘇達(dá)州東北部的Taconite稅收減免區(qū)(TTRA)。Excelsior Energy Inc. (Excelsior)提出將Mesaba能源項(xiàng)目分為兩個(gè)階段進(jìn)行設(shè)計(jì)、施工和運(yùn)營(yíng);每一階段將名義上產(chǎn)生600兆瓦的電力(MWe)輸出到電網(wǎng),總計(jì)1200兆瓦。能源部提出的行動(dòng)是提供總計(jì)3600萬美元的聯(lián)合資助,通過合作協(xié)議與精益求精的在清潔煤電倡議(CCPI)計(jì)劃,設(shè)計(jì)和一年期操作示范測(cè)試段階段即第一階段的總成本是目前估計(jì)在21.6億美元的合作協(xié)議。該EIS將Mesaba能源項(xiàng)目的兩個(gè)階段作為相互關(guān)聯(lián)的行動(dòng)來處理,即使只有第一階段將由CCPI項(xiàng)目共同資助。美國(guó)能源部也可以根據(jù)2005年能源政策法案為項(xiàng)目第一階段提供貸款擔(dān)保。貸款擔(dān)保的批準(zhǔn)也被認(rèn)為是需要接受《國(guó)家環(huán)境政策法》審查的一項(xiàng)重大聯(lián)邦行動(dòng)。
This Final Environmental Impact Statement (EIS) provides information about the potential environmental impacts of the proposed Mesaba Energy Project, a coal-based Integrated Gasification Combined Cycle (IGCC) electric power generating facility that would be located in the Taconite Tax Relief Area (TTRA) of northeastern Minnesota. Excelsior Energy Inc. (Excelsior) proposes to design, construct, and operate the Mesaba Energy Project in two phases; each phase would nominally generate 600 megawatts of electricity (MWe) for export to the electrical grid, 1,200 MWe total. DOE’s Proposed Action is to provide a total of $36 million in co-funding, through a cooperative agreement with Excelsior under the Clean Coal Power Initiative (CCPI) Program, for the design and one-year operational demonstration testing period for Phase I. The total cost of Phase I is currently estimated in the cooperative agreement at $2.16 billion. This EIS addresses the impacts of both phases of the Mesaba Energy Project as connected actions, even though only Phase I would be co-funded under the CCPI Program. DOE may also provide a loan guarantee to Excelsior pursuant to the Energy Policy Act of 2005 for Phase I of the proposed project. Approval of the loan guarantee is also considered a major Federal action subject to NEPA review.
資料截圖
版權(quán):如無特殊注明,文章轉(zhuǎn)載自網(wǎng)絡(luò),侵權(quán)請(qǐng)聯(lián)系cnmhg168#163.com刪除!文件均為網(wǎng)友上傳,僅供研究和學(xué)習(xí)使用,務(wù)必24小時(shí)內(nèi)刪除。
熱門推薦
-
加拿大煤炭開采Coal Mining in Canada 2021-09-09
-
年終總結(jié)新年計(jì)劃工作匯報(bào)PPT模板 2021-09-09
