FutureGen 2.0 Program-DEIS-Summary(2013年)FUTUREGEN 2.0 PROGRAM-DEIS-SUMMARY(2013)
- 資料類別:
- 資料大?。?/li>
- 資料編號(hào):
- 資料狀態(tài):
- 更新時(shí)間:2021-09-09
- 下載次數(shù):次
資料簡介
本環(huán)境影響報(bào)告書(EIS)評(píng)估與美國能源部提議的為“未來發(fā)電聯(lián)盟”2.0項(xiàng)目提供財(cái)政援助的行動(dòng)相關(guān)的潛在影響,包括擬議項(xiàng)目的建設(shè)和運(yùn)營所產(chǎn)生的直接和間接環(huán)境影響。能源部提議的行動(dòng)將提供大約10億美元的資金(主要根據(jù)《美國復(fù)蘇與再投資法》),以支持“未來發(fā)電2.0”項(xiàng)目的建設(shè)和運(yùn)營。這筆資金將用于項(xiàng)目的設(shè)計(jì)和開發(fā)、基本設(shè)備的采購、建設(shè),以及支持一個(gè)為期56個(gè)月、集碳捕集和封存為一體的燃煤發(fā)電廠的示范期。
This Environmental Impact Statement (EIS) evaluates the potential impacts associated with DOE’s proposed action to provide financial assistance to the FutureGen Alliance (the Alliance) for the FutureGen 2.0 Project, including the direct and indirect environmental impacts from construction and operation of the proposed project. DOE’s proposed action would provide approximately $1 billion of funding (primarily under the American Recovery and Reinvestment Act) to support construction and operation of the FutureGen 2.0 Project. The funding would be used for project design and development, procurement of capital equipment, construction, and to support a 56-month demonstration period for a coal-fueled electric generation plant integrated with carbon capture and storage.
資料截圖
版權(quán):如無特殊注明,文章轉(zhuǎn)載自網(wǎng)絡(luò),侵權(quán)請聯(lián)系cnmhg168#163.com刪除!文件均為網(wǎng)友上傳,僅供研究和學(xué)習(xí)使用,務(wù)必24小時(shí)內(nèi)刪除。
熱門推薦
-
加拿大煤炭開采Coal Mining in Canada 2021-09-09
-
化工節(jié)能技術(shù)手冊 王文堂 2006年化學(xué)工業(yè)出版社 2021-09-09
-
年終總結(jié)新年計(jì)劃工作匯報(bào)PPT模板 2021-09-09
