擬建設(shè)施的主要場(chǎng)地將占地約35英畝,一條較短的現(xiàn)場(chǎng)傳輸線(約3200英尺長(zhǎng))將占用少量額外土地。設(shè)施將消耗資源包括煤炭、天然氣、水和少量的過(guò)程化學(xué)品、油漆、它,和潤(rùn)滑劑(8節(jié))。該設(shè)施將使用一些現(xiàn)有的斯坦頓能源中心的基礎(chǔ)設(shè)施(如道路、鐵路循環(huán),鐵路車卸貨建筑,和天然氣線),這將減少重復(fù)設(shè)施和基礎(chǔ)設(shè)施。該項(xiàng)目將產(chǎn)生空氣排放、液體排放物和固體廢物。然而,現(xiàn)場(chǎng)不會(huì)排放任何工藝廢水或水處理排放物。氣化灰將盡可能有益地加以利用,只有在沒(méi)有發(fā)現(xiàn)有益用途的情況下,才會(huì)被就地掩埋。無(wú)水氨和硫磺副產(chǎn)品將被回收和銷售。
The proposed facilities’ main site would occupy about 35 acres, and a short onsite transmission line (approximately 3,200 ft in length) would occupy a small amount of additional land. The facilities would consume resources including coal, natural gas, water, and small quantities of process chemicals, paints, degreasers, and lubricants (Section 8). The proposed facilities would use some of the existing Stanton Energy Center’s infrastructure (e.g., roads, rail loop, rail car unloading building, and natural gas line), which would reduce duplication of facilities and infrastructure. The project would generate air emissions, liquid effluents, and solid wastes. However, no process waste streams or water treatment discharges would be released off the site. Gasification ash would be used beneficially to the extent possible and would be placed in the onsite landfill only if no beneficial use were found. Anhydrous ammonia and sulfur byproducts would be recovered and marketed.
資料截圖
版權(quán):如無(wú)特殊注明,文章轉(zhuǎn)載自網(wǎng)絡(luò),侵權(quán)請(qǐng)聯(lián)系cnmhg168#163.com刪除!文件均為網(wǎng)友上傳,僅供研究和學(xué)習(xí)使用,務(wù)必24小時(shí)內(nèi)刪除。
熱門推薦
-
加拿大煤炭開(kāi)采Coal Mining in Canada 2021-09-09
-
年終總結(jié)新年計(jì)劃工作匯報(bào)PPT模板 2021-09-09